Google
×
Dec 22, 2023 · Connect the new switch while powered off to the stack. The existing stack remains powered on. Power on the new switch and wait.
Jan 19, 2023 · I need to stack 2 new catalyst C9300X-12Y on a stack of C9300-48T (2 switches currently on the stack and will be adding another 2 C9300X-12Y switches to it).
May 6, 2020 · I currently have 2 stacks of 4 in one office. I have the capacity to condense both stacks into one and I'm curious as to what the design considerations are.
Feb 26, 2020 · Depends on the firmware loaded but Catalyst 9300 can support up to SIXTEEN (16) in a stack. I've already seen someone in this ( ...
Apr 1, 2020 · Yes, you can stack Cat9300's with additional, special, cables from Cisco, this is also referred to as 'data stacking.' These data stacking cables are connected ...
Dec 10, 2023 · I plug the new switch in with power, and the 2 stack cables. I then enable the stack ports. The first switch recognizes the second switch and ...
Apr 17, 2019 · If you boot them all at once and don't set priority, they'll probably be out of order. And I've had stacks crash when trying to add a new switch ...
Nov 9, 2023 · The 9300X support two stacking speeds - one for a pure 9300X stack, and one for mixed 9300/9300X. If you're running mis-matched stack speeds, they will not ...
Dec 21, 2022 · Stackwise Virtual (aka VSS) has a maximum of two chassis. Stackwise, particularly 9300, is "officially" 8 but can stack up to 16 ...
Dec 23, 2023 · We have six, 9300-48P switches that we plan on making a stack out of which is easy enough. My question is: Can we split the power into two ...